Dunaway provided construction inspection services an Underground Storage Tank and Booster Pump Project for Caddo Basin SUD. This project consists of a 750,000-gallon wire-wound underground concrete water storage tank with a perimeter drain system, two each – 1,500 GPM and 1 each 750 GPM vertical turbine pumps, electrical/SCADA controls, and disinfection building, electrically operated butterfly fill valve, and yard piping.
-
Location:Greenville, Texas
-
Client:Caddo Basin SUD
-
Services:Construction Inspection