Dunaway’s structural team partnered with PBK Architects for the design of multiple additions to an existing high school, Manor New Tech High School, located in Manor, Texas. Additions included a 30,000-square-foot, two-story, composite steel-framed classroom addition. Other additions include a two-story vaulted entry and a structurally isolated, two-way concrete slab foundation to accommodate poor soil conditions. 

  • Location:
    Manor, Texas
  • Client:
    PBK Architects
  • Owner:
    Manor Independent School District
  • Services:
    Structural Engineering