As part of the CR 1232 project, Dunaway provided design, FEMA coordination, a CLOMR, and LOMR for this draw crossing, one of the largest bridge structures in Midland County. The project’s geotechnical engineer indicated that soil conditions were incredibly poor along this half-mile stretch. Dunaway used Geopier as the foundation for the Contech bridge system.